
Add to Cart
Our company is a professional manufacturer of galvanized steel pipe, welded pipe ,galvanized square/Rectangular tube and scaffolding products. we believed in the best quality, reasonable price, on time delivery and super service.
Quick Details of Galvanized Steel Square Tubing:
Item Name | Schedule 40 Square Carbon Steel Tube Galvanized Steel Square Tubing Galvanized Pipe Weight Per Meter |
Size | 10*10-600*600mm,WT:0.3-30mm,Length:fixed or random, as customer request. |
Material | Q195-235,Q195,Q235,Q345 |
Surface | Black bared ,can be galvanized, oiled, painted, powdered... |
Standard | GB/T 13912-2002, ASTM A53, BS1387, GB/T9711, GB/T3901 |
Technique | Welded, ERW Cold Rolled, Hot Rolled |
Ends | Plain |
Packing | oiled/painted, in bundles and tarpaulin outside |
Productivity | 1,500,000Metric Tons per Month |
Delivery Detail | 15-20days after receive the prepayment or L/C |
Specification of Galvanized Steel Square Tubing:
OD mm | WT mm | OD mm | WT mm | OD mm | WT mm | OD mm | WT mm |
15x15 | 0.5-2.0 | 28x28 | 0.5-3.0 | 75x75 | 1.0-5.0 | 160x160 | 2.5-12 |
16x16 | 0.5-2.0 | 30x30 | 0.5-3.25 | 80x80 | 1.0-5.0 | 180x180 | 2.5-12 |
18x18 | 0.5-2.0 | 35x35 | 0.5-3.5 | 90x90 | 1.0-6.0 | 200x200 | 2.5-12 |
19x19 | 0.5-2.0 | 40x40 | 0.8-3.75 | 100x100 | 1.0-6.0 | 300x300 | 2.5-12 |
20x20 | 0.5-3.0 | 50x50 | 0.8-3.75 | 120x120 | 2.5-12 | 400x400 | 2.5-12 |
24x24 | 0.5-3.0 | 60x60 | 1.0-4.0 | 140x140 | 2.5-12 | 500x500 | 2.5-12 |
25x25 | 0.5-3.0 | 70x70 | 1.0-5.0 | 150x150 | 2.5-12 | 600x600 | 2.5-12 |
1.What can you provide as a manufacturer?
A. We offer one-stop solution and our services include Production, Packing, Loding, Shippment Ordering,
Custom claiming, Custom clearing etc
B. Product range: Ringlock System Scaffolding, Cuplock System Scaffolding, Kwikstage System
Scaffolding, Tubes & Fittings, Steel Planks, Base jacks etc.
C. OEM and ODM service offered upon customer request.
How can I trust your quality?
1. T&T has been accessed by Sira Certification Service and found to comply with ISO9001:
2008 for the manufacture and sales of scaffolds. Quality inspectors examine the whole production flow
from raw material selection to final products.
2. Safety is the prime concern in T&T. All components are backed up by an intensive test program,
fabricated either by auto-welding machines or man welders(welders have got Welder's Qualification
Test Certification from SGS).
Packaging & Shipping
(1) naked pipe shipped in container or in bulk
(2) Plastic cloth or water proof package shipped in container or in bulk
(3) according to the buyer's request
For 20" container the max length is 5.8m;
For 40" container the max length is 11.8m.
FAQ
Q: Are you trading company or manufacturer ?
A: We are agent of factory.
Q: How long is your delivery time?
A: 10-15 days after received your deposit or original L/C .
Q: Do you provide samples ?is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: T/T,100% L/C at sight, Cash, Western Union.